I poured Readymix concrete (25MPa) this week in six squares, shuttered with timber. After casting three squares, I removed the shuttering and cast the remaining three squares butting up against the initial slabs (with rebar holding them together). As I was going to be using some form of floor covering, I just steel floated the concrete by hand.
Shuttering & reinforcing in 1st three slabs thrown 1st 3 slabs curing Last 3 slabs thrown